Show the arithmetic: what a change order should look like
A change order with one number on it is a request for trust. Here is what we send instead, and why it takes longer.
Field Notes
Written by the people who ran the jobs. No thought leadership, no trend pieces.
A change order with one number on it is a request for trust. Here is what we send instead, and why it takes longer.
The answer is usually tilt-up, and the exceptions are predictable. Here is the arithmetic we run.
If your building cannot close, the contractor selection criteria are different. These are the questions that separate firms who have done it from firms who say they have.
Free preconstruction is a sales activity. Paid preconstruction is an estimate somebody is accountable for. The difference shows up in month fourteen.
The delivery method decides who carries the risk when the drawings turn out to be wrong. Here is how to pick, in plain terms.
The experience modification rate is the most quoted number in contractor prequalification and the least understood. Here is how to read one.
Eleven feet of uncontrolled fill turned up after the foundation package was priced. The fix was not the obvious one.
Twenty-six months of steel erection and concrete against a live surgical wing, without shutting an operating room.